Keel and stems installed. Job NB001 has been lifted off the moulds and is now in Bay B where it will now have the internal fit-out before turning up-side down again to have the outside hull painted. NB001 has now reached Milestone 2. 

{youtube}jjZ0JcPdWqM{/youtube}

Week7 (7)
Click for album